Ham Thuan Hydropower Project


04:36' CH-24, 24/02/2014

Spillway

Intake

Main dam

Ham Thuan - Da Mi hydropower project locates on La Nga river basin belonging to Dong Nai river basin. Ham Thuan hydropower reservoir is on Lam Dong and Binh Thuan provinces with reservoir surface area at normal water level (+605) of about 25.2 km2. Da Mi hydropower reservoir is a daily one, the lower step of Ham Thuan hydropower project. The two projects are away from each other about 10 km. Ham Thuan - Da Mi hydropower project is away from Ho Chi Minh city about 200 km.

Ham Thuan hydropower project consisting of 2 units with capacity of 300 MW was commenced in 1997 and put in operation in 2001. Similar to Ham Thuan hydropower project, Da Mi hydropower project consists of 2 units with capacity of 175 MW.

The two projects are equipped with advanced technological equipment made in Japan, USA, Canada, Italia, etc.

Major parameters of Ham Thuan hydropower project:

Reservoir:
Normal water level: +605

Dead water level: +575

Total storage capacity: 695 x 106m3

Effective storage capacity: 523 x 106m3

Dam:
01 main dam and 04 auxiliary dams;

Main dam:

Type: Rockfill, central impervious core

Height: 93.5 m

Crest elevation: +609.5

Crest length: 686 m

Auxiliary dams are homogeneous ones.

Total hits 49  -  Last update 24/02/2014 04:46' CH

Tài nguyên

© 2012 Vietnam Hydraulic Engineering Consultants Corporation - JSC.
Address: 95/2 Chua Boc Street, Dong Da District, Hanoi - Tel: (04) 3852-6285 - Fax: (04) 3563-2169
Chief Editor: Vo Van Lung - Deputy Director General

Visit Total: .
Visitor Online: .
Sponsor links (Provided by VIEPortal.net - The web cloud services for enterprises)
Thiết kế web, Thiết kế website, Thiết kế website công ty, Dịch vụ thiết kế website, Dịch vụ thiết kế web tối ưu, Giải pháp portal cổng thông tin, Xây dựng website doanh nghiệp, Dịch vụ web bán hàng trực tuyến, Giải pháp thương mại điện tử, Phần mềm dịch vụ web, Phần mềm quản trị tác nghiệp nội bộ công ty,