01:18' CH 16/04/2014
-Project Owner: Binh Dien Hydropower Joint-stock Company
-Construction location: In Binh Dien commune, Huong Tra district, Thua Thien Hue province.
-Installed capacity: 44 MW
-Annual average power output: 181.65 million kWh/year.
-Total investment cost: 1071 billion VND.
-Commencement: 01/2005
-Completion: 04/2009
01:44' CH 07/04/2014
Bac Ha Hydropower Project constructed on Chay river (which is the second cascade behind Thac Ba hydropower project) is the project under Vietnam power development programe, period 2001-2010 considering prospect by the year 2020 according to the decision No.40/2003 of Prime Minister.
10:41' SA 24/02/2014
Project major technical parameters:
According to decision No. 42 QĐ/NEDI1-HĐQT dated 30/11/2005, technical parameters of Ho Ho hydropower project are as follows:
Project name: Ho Ho Hydropower Project
Project Owner: North Electricity Development and Investment Joint-stock Company No.1.
Construction location: Dam and powerhouse are located in Huong Hoa commune, Tuyen Hoa district, Quang Binh province, reservoir is located in Huong Lien commune, Huong Khe district, Ha Tinh province.
11:26' SA 21/02/2014
With length of about 150km originating from Xuan Loc mountain in Dong Nai province, running through Dat Do, Long Dien and Xuyen Moc districts, Ba Ria-Vung Tau province and flowing into ocean through Loc An estuary, Ray river plays an important role in supplying water for domestic use and agricultural production of Ba Ria-Vung Tau province.

Tài nguyên

© 2012 Vietnam Hydraulic Engineering Consultants Corporation - JSC.
Address: 95/2 Chua Boc Street, Dong Da District, Hanoi - Tel: (04) 3852-6285 - Fax: (04) 3563-2169
Chief Editor: Vo Van Lung - Deputy Director General

Visit Total: .
Visitor Online: .