Home > Projects > CS

Ho Ho Hydropower Project


10:41' SA-24, 24/02/2014

Project major technical parameters:

According to decesion No. 42 QĐ/NEDI1-HĐQT dated 30/11/2005, technical parameters of Ho Ho hydropower project are as follows:

Project name: Ho Ho Hydropower Project

Project Owner: North Electricity Development and Investment Joint-stock Company No.1.

Construction location: Dam and powerhouse are located in Huong Hoa commune, Tuyen Hoa district, Quang Binh province, reservoir is located in Huong Lien commune, Huong Khe district, Ha Tinh province.

Scale and grade of the project:

- Grade 3 (According to the standard TCXDVN 285-2002)

- Intalled capacity: 14MW.

- Firm capacity: 2.84MW.

- Annual average power output: 55.6 million kwh.

Major technical parameters:

- Water source: Ngan Sau river.

- Catchment area to the construction site: 278.6km2.

- Normal water level: 70m

- Dead water level: 67.5m.

- Total storage capacity: 38 million m3.

- Design head: 44m.

Total hits 60  -  Last update 27/02/2014 04:39' CH

Tài nguyên

© 2012 Vietnam Hydraulic Engineering Consultants Corporation - JSC.
Address: 95/2 Chua Boc Street, Dong Da District, Hanoi - Tel: (04) 3852-6285 - Fax: (04) 3563-2169
Chief Editor: Vo Van Lung - Deputy Director General

Visit Total: .
Visitor Online: .
Sponsor links (Provided by VIEPortal.net - The web cloud services for enterprises)
Thiết kế web, Thiết kế website, Thiết kế website công ty, Dịch vụ thiết kế website, Dịch vụ thiết kế web tối ưu, Giải pháp portal cổng thông tin, Xây dựng website doanh nghiệp, Dịch vụ web bán hàng trực tuyến, Giải pháp thương mại điện tử, Phần mềm dịch vụ web, Phần mềm quản trị tác nghiệp nội bộ công ty,