09:43' SA 19/03/2014
Project location: Thach Han river in Quang Tri
Construction time: Commencement: 3/1978 - Completion: 2002.
Project managers: Le Van Khuong, Pham Khac Minh Hung, Pham Vu Liem
Project tasks: Irrigating 17,000 ha of cultivated land
03:03' CH 18/03/2014
Project location: Headworks group is located on Ayun river in Ho Bong commune, Chu Se district, Gia Lai province (2000).
Consultancy contents:
- Geological investigation
- Topographic survey
- Preparation of feasibility study report
- Preparation of technical design + Total cost estimation
- Preparation of detailed design + Cost estimation
Project Managers: Tran Dang Am, Le Dinh Tuyet
02:46' CH 14/03/2014
Project location: On upstream of Easuop stream in Chu Ma Lanh commune, Easup district, Dak Lak province.
Construction time: Commencement on 12/6/2001
Project managers: Hoang Minh Dzung, Phan Nhu Hai, Nguyen Huu Ngoc
Project tasks:
- Irrigation area: 9455 ha
- Supplying water for domestic use
- Aquaculture
- Improving climate
- Generating power, N=1600 kw
04:07' CH 13/03/2014
Project location: Lu river, Ninh Thuan province
Construction time: 1998, 2001
Project managers: Gia Kim Hung,Tran Minh Tan
Project tasks:
Irrigating 3000 ha of cultivated land of Ninh Phuoc district.
Supplying water for domestic use
Retarding flood
10:48' SA 11/03/2014
Project location: Long Song river, Binh Thuan province
Construction time: Commencement in 2001
Project managers: Le Van Ngo - Do Van Xung - Phan Van Luong
Project tasks: Irrigating 4260 ha
03:13' CH 08/02/2014
Project location: Ta Trach river in Duong Hoa commune, Huong Thuy district, Thua Thien Hue province
Construction time: Investigation and design time: 2000-2005
Construction commencement: 26-11-2005
Project managers: Luong Van Nguyen, Phan Vinh Khanh
Project tasks:
+ Controlling early flood, mitigating major flood for Huong river system.
+ Supplying water for domestic and industrial uses with Q = 2.0 m3/s
+ Creating stable irrigation source for 34,782 ha of cultivated land in Huong river delta area.
+ Adding fresh water source for downstream of Huong river to push saline intrusion, improve environment in lagoon area, aquaculture with Q = 25.0 m3/s.
+ Generating power with installed capacity N=19.5 MW
10:45' SA 21/01/2014
Project location: Chu river - Thuong Xuan district, Thanh Hoaprovince
Construction time: Investigation and design time: 1999-2004
Commencement time: 02/02/2004
Project managers: Dinh Xuan Tu, Le Van Ngo, Le Manh Hiep, Hoang Minh Dzung, Vo Van Lung
Major technical parameters: - Work grade: I; - Catchment area: 5938 km2; - Normal water level (NWL): 110 m; - Dead water level (DWL): 73 m; - Total storage capacity: 1,450 million m3; - Effective storage capacity: 793.70million m3; - Dead storage capacity: 268.69million m3
Page: 1/3

Tài nguyên

© 2012 Vietnam Hydraulic Engineering Consultants Corporation - JSC.
Address: 95/2 Chua Boc Street, Dong Da District, Hanoi - Tel: (04) 3852-6285 - Fax: (04) 3563-2169
Chief Editor: Vo Van Lung - Deputy Director General

Visit Total: .
Visitor Online: .
Sponsor links (Provided by VIEPortal.net - The web cloud services for enterprises)
Thiết kế web, Thiết kế website, Thiết kế website công ty, Dịch vụ thiết kế website, Dịch vụ thiết kế web tối ưu, Giải pháp portal cổng thông tin, Xây dựng website doanh nghiệp, Dịch vụ web bán hàng trực tuyến, Giải pháp thương mại điện tử, Phần mềm dịch vụ web, Phần mềm quản trị tác nghiệp nội bộ công ty,