Lower Ayun ReservoirProject location: Headworks group is located on Ayun river in Ho Bong commune, Chu Se district, Gia Lai province (2000). Consultancy contents: - Geological investigation - Topographic survey - Preparation of feasibility study report - Preparation of technical design + Total cost estimation - Preparation of detailed design + Cost estimation Project Managers: Tran Dang Am, Le Dinh Tuyet Project tasks: Supplying gravity irrigation water for 13 500 ha of cultivated land in Ayun district; Providing water for sugar cane factory with capacity of 2 800 T/day; Aquaculture, power generation for irrigation pumping stations in the area (capacity of 2,700 KW). Major technical parameters: - Work grade: II (TCXDVN 285:2002) - Basin area: 1670 km2 - Total storage capacity: 253 x 106 m3 - Effective storage capacity: 201 x 106 m3 - Dead storage capacity: 52 x 106m3 - Dam crest length: 370.0 m - Maximum dam height: 36.0 m - Bspillway: 18 m - Qspillway: 1 237.0 m3/s - Earth excavation, earthfill: 4 488,940 m3 - Rock excavation: 285.43m3 - Concrete of various types: 55.387 m3 - Masonry works: 37.61 m3 Scale of project works: - Earth dam: Inhomogeneous dam - Spillway: Reinforced concrete, 3 segment gates, BxH = 6x5, electrically operated, bucket type energy dissipator. - Intake: Reinforced concrete, located in right abutment of main dam, design discharge of 13.4 m3/s, power generation. - Canal system: consisting of main canal, North canal, South canal and 40 canals (including primary and smaller ones). Total hits 33 - Last update 18/03/2014 03:03' CH |
|