Cost estimation


03:52' CH-10, 10/12/2013

HEC has prepared total investment cost, total cost estimation and detailed cost estimation for many hydraulic and hydropower projects
Professional capability:

• Preparation of total investment cost of construction investment project as follows:

o Construction cost;
o Equipment cost;
o Ground clearance compensation, resettlement cost;
o Project management cost and other costs;
o Contingency cost.

• Preparation of construction total cost estimation as follows:

o Construction cost,
o Equipment cost,
o Other costs are included in construction cost and contingency cost,
o Project management cost and other costs.

• Preparation of construction cost estimation as follows:

o Construction cost;
o Equipment cost;
o Other costs;
o Contingency cost;

• In addition, preparation of cost estimation for tender, settlement of basic construction investment capital.
Major regulations and standards used in design:
• QCVN 04 - 01:2010/BNNPTNT: National technical regulations on elements, contents of Investment Report, Investment Project and Technical economic Report of hydraulic projects.
• QCVN 04 - 02: 2010/BNNPTNT: National technical regulations on elements, contents of technical design documents and detailed design documents of hydraulic projects.
• Vietnamese construction standard includes 11 volumes as follows:

o Volume 1 - Standard of planning, investigation, construction geodesy;
o Volume 2 - General standards on construction design;
o Volume 3 - Design standard of construction project;
o Volume 4 - Design standard of construction structure;
o Volume 5 - Technical equipment installation and design standard;
o Volume 6 - Standard of materials and construction components;
o Volume 7 - Standard of fire and explosion prevention and construction safety;
o Volume 8 - Standard of construction and acceptance of construction project;
o Volume 9 - Standard of construction and acceptance of steel and reinforced concrete structure;
o Volume 10 - Standard of soil, water, air and testing method;
o Volume 11 - Standard of testing method and construction materials.

• Basic construction cost estimation norm.
• Basic construction unit price.

Tools, equipment used in design:

• Desktop computer, laptop, printer, projector, automobile, etc.
• Software:

o AUTOCAD 2012 with copyright;
o SAP2000 UTIMATE Version V15 with copyright;
o ABACUS with copyright;
o GEOSLOPE set with copyright (including Geoslope/W, 2D and 3D seep/w; Sigma/w);
o Canal design software - TKK with copyright;
o Window, winword, and other office software;
o Other copyrighted software includes digital resource management software, official correspondence management software, etc.
o And other applied software include MAPINFO, ARCVIEW, AUTOCAD and many modules for design set up by HEC.

• Documents of projects are kept in archive of HEC.

Total hits 49  -  Last update 26/02/2014 03:28' CH
Photo gallery
Video Gallery

Tài nguyên

© 2012 Vietnam Hydraulic Engineering Consultants Corporation - JSC.
Address: 95/2 Chua Boc Street, Dong Da District, Hanoi - Tel: (04) 3852-6285 - Fax: (04) 3563-2169
Chief Editor: Vo Van Lung - Deputy Director General

Visit Total: .
Visitor Online: .