Cost estimation


03:52' CH-10, 10/12/2013

HEC has prepared total investment cost, total cost estimation and detailed cost estimation for many hydraulic and hydropower projects
Professional capability:

• Preparation of total investment cost of construction investment project as follows:

o Construction cost;
o Equipment cost;
o Ground clearance compensation, resettlement cost;
o Project management cost and other costs;
o Contingency cost.

• Preparation of construction total cost estimation as follows:

o Construction cost,
o Equipment cost,
o Other costs are included in construction cost and contingency cost,
o Project management cost and other costs.

• Preparation of construction cost estimation as follows:

o Construction cost;
o Equipment cost;
o Other costs;
o Contingency cost;

• In addition, preparation of cost estimation for tender, settlement of basic construction investment capital.
Major regulations and standards used in design:
• QCVN 04 - 01:2010/BNNPTNT: National technical regulations on elements, contents of Investment Report, Investment Project and Technical economic Report of hydraulic projects.
• QCVN 04 - 02: 2010/BNNPTNT: National technical regulations on elements, contents of technical design documents and detailed design documents of hydraulic projects.
• Vietnamese construction standard includes 11 volumes as follows:

o Volume 1 - Standard of planning, investigation, construction geodesy;
o Volume 2 - General standards on construction design;
o Volume 3 - Design standard of construction project;
o Volume 4 - Design standard of construction structure;
o Volume 5 - Technical equipment installation and design standard;
o Volume 6 - Standard of materials and construction components;
o Volume 7 - Standard of fire and explosion prevention and construction safety;
o Volume 8 - Standard of construction and acceptance of construction project;
o Volume 9 - Standard of construction and acceptance of steel and reinforced concrete structure;
o Volume 10 - Standard of soil, water, air and testing method;
o Volume 11 - Standard of testing method and construction materials.

• Basic construction cost estimation norm.
• Basic construction unit price.

Tools, equipment used in design:

• Desktop computer, laptop, printer, projector, automobile, etc.
• Software:

o AUTOCAD 2012 with copyright;
o SAP2000 UTIMATE Version V15 with copyright;
o ABACUS with copyright;
o GEOSLOPE set with copyright (including Geoslope/W, 2D and 3D seep/w; Sigma/w);
o Canal design software - TKK with copyright;
o Window, winword, and other office software;
o Other copyrighted software includes digital resource management software, official correspondence management software, etc.
o And other applied software include MAPINFO, ARCVIEW, AUTOCAD and many modules for design set up by HEC.

• Documents of projects are kept in archive of HEC.

Total hits 82  -  Last update 26/02/2014 03:28' CH
Photo gallery
Video Gallery

Tài nguyên

© 2012 Vietnam Hydraulic Engineering Consultants Corporation - JSC.
Address: 95/2 Chua Boc Street, Dong Da District, Hanoi - Tel: (04) 3852-6285 - Fax: (04) 3563-2169
Chief Editor: Vo Van Lung - Deputy Director General

Visit Total: .
Visitor Online: .
Sponsor links (Provided by VIEPortal.net - The web cloud services for enterprises)
Thiết kế web, Thiết kế website, Thiết kế website công ty, Dịch vụ thiết kế website, Dịch vụ thiết kế web tối ưu, Giải pháp portal cổng thông tin, Xây dựng website doanh nghiệp, Dịch vụ web bán hàng trực tuyến, Giải pháp thương mại điện tử, Phần mềm dịch vụ web, Phần mềm quản trị tác nghiệp nội bộ công ty,