Cost estimationHEC has prepared totalinvestment cost, total cost estimation and detailed cost estimation for manyhydraulic and hydropower projects Professional capability: - Preparation of total investment cost of construction investment project as follows:
- Construction cost;
- Equipment cost;
- Ground clearance compensation, resettlement cost;
- Project management cost and other costs;
- Contingency cost.
- Preparation of construction total cost estimation as follows:
- Construction cost,
- Equipment cost,
- Other costs are included in construction cost and contingency cost,
- Project management cost and other costs.
- Preparation of construction cost estimation as follows:
- Construction cost;
- Equipment cost;
- Other costs;
- Contingency cost;
- In addition, preparation of cost estimation for tender, settlement of basic construction investment capital.
Major regulations andstandards used in design: - QCVN 04 - 01:2010/BNNPTNT: National technical regulations on elements, contents of Investment Report, Investment Project and Technical economic Report of hydraulic projects.
- QCVN 04 - 02: 2010/BNNPTNT: National technical regulations on elements, contents of technical design documents and detailed design documents of hydraulic projects.
- Vietnamese construction standard includes 11 volumes as follows:
- Volume 1 - Standard of planning, investigation, construction geodesy;
- Volume 2 - General standards on construction design;
- Volume 3 - Design standard of construction project;
- Volume 4 - Design standard of construction structure;
- Volume 5 - Technical equipment installation and design standard;
- Volume 6 - Standard of materials and construction components;
- Volume 7 - Standard of fire and explosion prevention and construction safety;
- Volume 8 - Standard of construction and acceptance of construction project;
- Volume 9 - Standard of construction and acceptance of steel and reinforced concrete structure;
- Volume 10 - Standard of soil, water, air and testing method;
- Volume 11 - Standard of testing method and construction materials.
- Basic construction cost estimation norm.
- Basic construction unit price.
Tools, equipment used indesign: - Desktop computer, laptop, printer, projector, automobile, etc.
- Software:
- AUTOCAD 2012 with copyright;
- SAP2000 UTIMATE Version V15 with copyright;
- ABACUS with copyright;
- GEOSLOPE set with copyright (including Geoslope/W, 2D and 3D seep/w; Sigma/w);
- Canal design software - TKK with copyright;
- Window, winword, and other office software;
- Other copyrighted software includes digital resource management software, official correspondence management software, etc.
- And other applied software include MAPINFO, ARCVIEW, AUTOCAD and many modules for design set up by HEC.
- Documents of projects are kept in archive of HEC.
|