Cua Dat Hydropower Project

03:35' CH-18, 18/02/2014

Project location: Xuan My commune - Thuong Xuan district - Thanh Hoa province

Project manager: Pham Van Thuc

Project tasks:

- Generating power with capacity of 97MW

- Mitigating flood, supplying water for industrial and domestic uses

- Creating stable irrigation water source for 86,862ha, supplementing water in dry season for downstream of Ma river to prevent saline intrusion and improve ecological environment.

Major techincal parameters:

Work grade: II

Technical parameter of reservoir:

- Normal water level: 113.30 m

- Design maximum water level P=0.1%: 120.27

- Dead storage capacity: 294.00 million m3

- Effective storage capacity: 1,070.80 million m3

- Reservoir surface area at normal water level: 33.00 km2

- Reservoir surface area at maximum water level (P = 0.1%): 38.50 km2

Scale and structure of the project works:

Main dam:

Rockfill dam: Dam crest elevation: 122.73m, parapet crest elevation: 123.53m; maximum dam height: 103m, dam length: 740 m.

Spillway:

Chute spillway with bottom energy dissipator, spillway sill elevation of 103.30m, dimension n(bxh) = 5x(15x16)m

Tunnel for construction diversion and flood relief:

+ Number of opening x diameter = 2 Ф11

+ Maximum relief discharge: 4607 m3/s

Powerhouse:

+ Number of unit x capacity: 02 x 48.50MW

+ Design discharge of 01 unit: 57.80 m3/s

+ Maximum head: 89.40 m

+ Minimum head: 45.70m

+ Design head: 69.30m

Sponsor links (Provided by VIEPortal.net - The web cloud services for enterprises)
Thiết kế web, Thiết kế website, Thiết kế website công ty, Dịch vụ thiết kế website, Dịch vụ thiết kế web tối ưu, Giải pháp portal cổng thông tin, Xây dựng website doanh nghiệp, Dịch vụ web bán hàng trực tuyến, Giải pháp thương mại điện tử, Phần mềm dịch vụ web, Phần mềm quản trị tác nghiệp nội bộ công ty,