Gia Vien Pumping Station

Project location:Red river in Nam Dinh, Ha Nam provinces.
Construction time:1964 - 1972.
Project managers:Nguyen Van Thuỵ, Pham Dinh Hoe, Nguyen Van Bac
Project tasks:
Irrigating 69.963 ha.
Draining 77.445 ha.
Major technical parameters
Work grade: I.
6 large electrical pumping stations including Coc Thanh, Co Dam, Huu Bi, Nhu Trac, Nham Trang, Vinh Tri with 35 OP6-87, OP6-145 pumps, capacity of 1 pump is from 11,000 m3/h - 32,000 m3/h.
Project results
Total cultivation area: 63,366 ha, increasing in paddy equivalent production from 145,700 ton (in 1965) to 302,476 ton (in 1990). Average food per capita is increased from 150 kg to 400 kg.
Scale of the project items
The project basin is the largest low-lying delta belonging to Ha Nam and Nam Dinh provinces with total area of 85,326 ha surrounded by Red river in the northeast, Day river in the west and Dao river in the southeast.
Topography of the basin is complicated with alternating high-low elevation, many hollow areas, interlaced ponds, lakes, rivers and streams.
The project basin characteristic is the typical one of low-lying area in the Northern delta.
In 6 pumping stations of the project, there are 5 irrigation, drainage pumping stations and 1 drainage pumping station.
The canal system consists of 18 irrigation canals with length of 133 km, 18 drainage area with length of 173 km, 3219 secondary and tertiary irrigation and drainage canals with total length of 3585 km.
On the canals, there are 12,847 related structures including intake, culverts, regulators, locks, siphons, etc.
Other content
Kenh Vang Pumping Station(21/03/2014)
Tan Chi Pumping Station(12/02/2014)
Phu Sa Pumping Station(11/02/2014)
North Nam Ha Pumping Station Project(11/02/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013









