Binh Dien Hydropower Project
16/04/2014-Project Owner: Binh Dien Hydropower Joint-stock Company
-Construction location: In Binh Dien commune, Huong Tra district, Thua Thien Hue province.
-Installed capacity: 44 MW
-Annual average power output: 181.65 million kWh/year.
-Total investment cost: 1071 billion VND.
-Commencement: 01/2005
-Completion: 04/2009Bac Ha Hydropower Project
07/04/2014Bac Ha Hydropower Project constructed on Chay river (which is the second cascade behind Thac Ba hydropower project) is the project under Vietnam power development programe, period 2001-2010 considering prospect by the year 2020 according to the decision No.40/2003 of Prime Minister. Ho Ho Hydropower Project
24/02/2014Project major technical parameters:
According to decision No. 42 QĐ/NEDI1-HĐQT dated 30/11/2005, technical parameters of Ho Ho hydropower project are as follows:
Project name: Ho Ho Hydropower Project
Project Owner: North Electricity Development and Investment Joint-stock Company No.1.
Construction location: Dam and powerhouse are located in Huong Hoa commune, Tuyen Hoa district, Quang Binh province, reservoir is located in Huong Lien commune, Huong Khe district, Ha Tinh province.Ray River Irrigation Project
21/02/2014With length of about 150km originating from Xuan Loc mountain in Dong Nai province, running through Dat Do, Long Dien and Xuyen Moc districts, Ba Ria-Vung Tau province and flowing into ocean through Loc An estuary, Ray river plays an important role in supplying water for domestic use and agricultural production of Ba Ria-Vung Tau province.
Latest news
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013













