• Binh Dien Hydropower Project

    Binh Dien Hydropower Project

      16/04/2014
    -Project Owner: Binh Dien Hydropower Joint-stock Company
    -Construction location: In Binh Dien commune, Huong Tra district, Thua Thien Hue province.
    -Installed capacity: 44 MW
    -Annual average power output: 181.65 million kWh/year.
    -Total investment cost: 1071 billion VND.
    -Commencement: 01/2005
    -Completion: 04/2009 
  • Bac Ha Hydropower Project

    Bac Ha Hydropower Project

      07/04/2014
    Bac Ha Hydropower Project constructed on Chay river (which is the second cascade behind Thac Ba hydropower project) is the project under Vietnam power development programe, period 2001-2010 considering prospect by the year 2020 according to the decision No.40/2003 of Prime Minister. 
  • Ho Ho Hydropower Project

    Ho Ho Hydropower Project

      24/02/2014
    Project major technical parameters:
    According to decision No. 42 QĐ/NEDI1-HĐQT dated 30/11/2005, technical parameters of Ho Ho hydropower project are as follows:
    Project name: Ho Ho Hydropower Project
    Project Owner: North Electricity Development and Investment Joint-stock Company No.1.
    Construction location: Dam and powerhouse are located in Huong Hoa commune, Tuyen Hoa district, Quang Binh province, reservoir is located in Huong Lien commune, Huong Khe district, Ha Tinh province. 
  • Ray River Irrigation Project

    Ray River Irrigation Project

      21/02/2014
    With length of about 150km originating from Xuan Loc mountain in Dong Nai province, running through Dat Do, Long Dien and Xuyen Moc districts, Ba Ria-Vung Tau province and flowing into ocean through Loc An estuary, Ray river plays an important role in supplying water for domestic use and agricultural production of Ba Ria-Vung Tau province.