Cua Dat Hydropower Project

![]() | ![]() |
Project location: Xuan My commune - Thuong Xuan district - Thanh Hoa province
Project manager:Pham Van Thuc
Project tasks:
- Generating power with capacity of 97MW
- Mitigating flood, supplying water for industrial and domestic uses
- Creating stable irrigation water source for 86,862ha, supplementing water in dry season for downstream of Ma river to prevent saline intrusion and improve ecological environment.
Major techincal parameters:
Work grade: II
Technical parameter of reservoir:
- Normal water level: 113.30 m
- Design maximum water level P=0.1%: 120.27
- Dead storage capacity: 294.00 million m3
- Effective storage capacity: 1,070.80 million m3
- Reservoir surface area at normal water level: 33.00 km2
- Reservoir surface area at maximum water level (P = 0.1%): 38.50 km2
Scale and structure of the project works:
Main dam:
Rockfill dam: Dam crest elevation: 122.73m, parapet crest elevation: 123.53m; maximum dam height: 103m, dam length: 740 m.
Spillway:
Chute spillway with bottom energy dissipator, spillway sill elevation of 103.30m, dimension n(bxh) = 5x(15x16)m
Tunnel for construction diversion and flood relief:
+ Number of opening x diameter = 2 Ф11
+ Maximum relief discharge: 4607 m3/s
Powerhouse:
+ Number of unit x capacity: 02 x 48.50MW
+ Design discharge of 01 unit: 57.80 m3/s
+ Maximum head: 89.40 m
+ Minimum head: 45.70m
+ Design head: 69.30m
Other content
A Lin Hydropower Project(04/04/2014)
Thac Ba Hydropower Project(04/03/2014)
OChum Hydropower Project(03/03/2014)
Nam Muc Hydropower Project(03/03/2014)
Dinh Binh Hydropower Project(18/02/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013