OChum Hydropower Project

Project location: Ochum river - Retanakiri - Cambodia
Construction time: 1991-1993
Project manager: Phan Nhu Hai
Project tasks: Supplying power for Ochum and Ban Lung towns in Retanakiri province.
Major technical parameters:
Headworks grade: III (QPVN-08-76)
Basin area :
- To the reservoir: 23.1 km2
- To the weir: 44.7 km2
Cascade exploitation is as follows:
- Yearly reservoir at upstream of Ochum 1 waterfall, a canal of 900m long connected with Ochum 1 hydropower plant.
- Construction of weir and Ochum 2 hydropower plant.
Ochum hydropower project was carried out by 3 companies:
Investigation and design: Hydraulic Design and Investigation Company No.1 (now HEC)
Construction: Hydraulic Union No.4
Equipment: Dumont (French)
Scale and structure of project works:
OChum 1 headworks group:
- Main dam: homogeneous earth dam, dam length: 800m, Hmax=20m
- Ungated, surface spillway, B=30m, Qmax=78m3/s.
- Dam crest elevation: +295.0m
- Maximum water level: +293m
- Normal water level: +291.5 m
- Dead water level: +279.0m
- Total storage capacity: 12.9 million m3
- Effective storage capacity: 12.63 million m3
- Hydropower plant:
. Number of unit: 1
. Hmax: 22.07 m
. Hmin: 21.59 m
. Hcp: 28.83 m
. Qdesign: 1.7 m3/s
.Ninstalled: 300 kw
Ochum 2 headworks group:
Weir consists of 2 parts:
Non-overflow part:: earthfill, length: 107.5 m; height: 10m.
Overflow part:: concrete, width B = 20m, height: 6m
Maximum water level: 257.65m
Normal water level: +254.0m
Dead water level: +252.0m
Hydropower plant: width: 7m, length: 25.2m
Number of unit: 2
Hmax: 34.26m
Hmin: 30.96m
Design head (Hdesign): 32.50m
Design discharge (Qtk): 3,76m3/s
Design capacity (Ndesign): 1000 kw
Average power output (Eo): 4.395 million kwh
Other content
A Lin Hydropower Project(04/04/2014)
Thac Ba Hydropower Project(04/03/2014)
Nam Muc Hydropower Project(03/03/2014)
Cua Dat Hydropower Project(18/02/2014)
Dinh Binh Hydropower Project(18/02/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013