Thac Ba Hydropower Project

![]() | ![]() |
Project location:Chay river, Yen Bai province
Project tasks:
- Power generation
- Flood control
Construction time:
- Commencement date: 19/08/1964
- River closure date: 22/02/1970
- Operation date of unit No.1: 05/10/1971
- Grid connection date: 19/05/1972
- Completion time: 12/1972
Two problems occurred during construction and after completion of the project are as follows:
- Migration of great number of people
- Rapid sedimentation speed in reservoir bed resulting to reduction of reservoir life
Consultants: Bacu Hydro-energy Design Institute (former Russia)
Corporation agency: Vietnam Hydropower, Hydraulic Design Institute (now HEC)
Major technical parameters
- Project grade: II
- Catchment area: 6 140 km2
- Normal water level: +58.00
- Dead water level: +46.00
- Parapet crest elevation: +63.00
- Check frequency P%=0.01% at elevation: +62.00
-Total storage capacity: 2160 million m3
-Dead storage capacity: 780 million m3
Scale and structure of project works
- Main dam: Rockfill dam, Hmax: 36m
- Auxiliary dam: 16 dams (12 on right bank, 04 on left bank)
- Spillway located on left bank, spillway width B: 68m, Q: 3 280 m3/s, gated spillway
- Lock
- Turnout: on left abutment of auxiliary dam No.3, dimension: 2x2m, length: 91m, design discharge Q: 10 m3/s.
- Riverbed type hydropower plant with closed roof, 3 units, capacity of each unit: N=36MW. Turbine Õp-5a. Bb-450. Total capacity N=108MW. Annual average power output E: 411 million KWh. Annual capacity used hours: 3800h.
Other content
A Lin Hydropower Project(04/04/2014)
OChum Hydropower Project(03/03/2014)
Nam Muc Hydropower Project(03/03/2014)
Cua Dat Hydropower Project(18/02/2014)
Dinh Binh Hydropower Project(18/02/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013