South Thach Han Reservoir

Project location: Thach Han river in Quang Tri
Construction time: Commencement: 3/1978 - Completion: 2002.
Project managers: Le Van Khuong, Pham Khac Minh Hung, Pham Vu Liem
Project tasks:Irrigating 17,000 ha of cultivated land
Major technical parameters:
- Basin area: 1,460 km2
- Work grade: II
- Maximum water level in front of dam: +20.05 m
- Normal water level: +8.30 m
Scale and structure of project major works:
Main dam: homogeneous earth dam, crest elevation: +21.70m, length: 680m, height: 24.70m and 7 auxiliary dams with height from 2m to 14.5m.
Spillway is located in the left bank: Wide crest, ungated spillway with chute, spillway sill elevation: +8.30, spillway width: 135m, maximum discharge p=1%: 7300 m3/s.
Intake: dimension: 5x2.5m, design discharge: 32 m3/s. Lock for boats weighted under 100 ton, dimension 5x7.5 m, length: 63m, intake bottom elevation: +5m
Sand sluice: dimension: 5x2m, discharge in flood season: 88 m3/s, sluice bottom elevation: +2m, L = 83m.
Canal system:
Main canal: 17,225 km long and 6 primary canals with total length of 90.385 km, details are as follows:
+ Canals N2A, N4, N6, N2B irrigate Hai Lang area
+ Canals N1, N3 irrigate Trieu Phong area
+ Quang Tri town is irrigated by over sided canals. Actually, after completion, the project only irrigates 50% of the planned area due to many reasons.
Recently, to restore irrigation capacity of the project, HEC has selected the option of raising spillway sill by a rubber dam of 2.2m high and 140m long to additionally store 9.750 million m3 of water and repaired a part of canal system to satisfy the planned irrigation area of the project.
Other content
Lower Ayun Reservoir(18/03/2014)
Upper Easoup Reservoir(14/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Long Song Reservoir(11/03/2014)
Ta Trach Reservoir(08/02/2014)
Cua Dat Reservoir(21/01/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013