Ta Trach Reservoir

![]() | ![]() |
Project location: Ta Trach river in Duong Hoa commune, Huong Thuy district, Thua Thien Hue province
Construction time:Investigation and design time: 2000-2005
Construction commencement:26-11-2005
Project managers: Luong Van Nguyen, Phan Vinh Khanh
Project tasks:
+ Controlling early flood, mitigating major flood for Huong river system.
+ Supplying water for domestic and industrial uses with Q = 2.0 m3/s
+ Creating stable irrigation source for 34,782 ha of cultivated land in Huong river delta area.
+ Adding fresh water source for downstream of Huong river to push saline intrusion, improve environment in lagoon area, aquaculture with Q = 25.0 m3/s.
+ Generating power with installed capacity N=19.5 MW
Work grade and design standards:
+ Grade: II (according to the standard TCXDVN 285:2002)
+ Design flood frequency: Pdesign=0.5%
+ Check flood frequency: Pcheck=0.1%
+ Standard for major flood mitigation with the flood in 1983 for Hue city: Reduction of water level (1.0 to 1.2m) at Kim Long.
+ Early flood control frequency: P=10%
+ Irrigation frequency: P=75%
+ Frequency for domestic and industrial water supply: P=90%
Major technical parameters of the reservoir:
+ Basin area: 717 km2
+ Design flood water level (Pdesign=0.5%): +50.00m
+ Check flood water level (Pcheck=0.1%): +53.07m
+ Normal water level: +45.00m
+ Water level before flood: +25.00m
+ Dead water level: +23.00m
+ Total storage capacity: 646 million m3
+ Storage capacity for flood mitigation with P=0.1%: 556.2 million m3
+ Storage capacity for flood mitigation with P=0.5%: 435.934 million m3
+ Dead storage capacity: 73.4 million m3
Scale and major technical parameters of the project works:
Main dam:
+ Site location: IIb, with marks ĐC1, ĐC2, ĐC3 and ĐM48
+ Dam crest elevation: +55.0m
+ Parapet elevation: +56.0m
+ Dam maximum height: 60.0m
+ Dam crest length 1.187m
+ Dam surface width: 10m
+ Type, structure: Mixed, zoned dam (central impervious block, upstream and downstream shells)
Spillway:
+ Type: Surface spillway combined with bottom outlet, chute and energy dissipator basin, constructed of reinforced concrete.
+ 5 surface outlet gates: B=5x9m, sill elevation +37.0m
+ 5 bottom outlet gates: B= (4.0x3.2)m, sill elevation +16.0m
+ Qdesign (with design frequency Pdesign=0.5%): 4.367 m3/s
+ Maximum relief discharge (with check frequency Pcheck=0.1%): 6.147 m3/s
+ Spillway width: 66 m
Non-overflow dam:
+ Type: Gravity concrete dam, square trapezoidal section, vertical upstream slope, downstream slope ratio: 1:0.75
+ Dam crest width: B=7.0m
+ Dam crest elevation: +54.0m
Tunnel:
+ Site location: On hill, between main dam and spillway, through marks TN1 and TN5
+ Total length: 372.48m
+ Arch cross section D=7m
Hydropower plant
+ Number of units: 03
+ Installed capacity: N = 19.5 MW
Other content
South Thach Han Reservoir(19/03/2014)
Lower Ayun Reservoir(18/03/2014)
Upper Easoup Reservoir(14/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Long Song Reservoir(11/03/2014)
Cua Dat Reservoir(21/01/2014)
Dinh Binh Reservoir(21/01/2014)
Nuoc Trong Reservoir(17/01/2014)
Ngan Truoi Reservoir(17/01/2014)
Tan My Reservoir(07/01/2014)
Truoi Reservoir(07/01/2014)