Nuoc Trong Reservoir

Project location:NuocTrong river, Quang Ngai province,the project is under construction.
Construction time:Investigation and design time: 2005-2010
Commencement:09/12/2005
Project managers:Nguyen Tri Trinh, Dinh Sy Quat, Vo Van Lung
Project tasks:
- Irrigating52.600 ha of agricultural land
- Supplying water to domestic use, Dung Quat economic zone, Van Tuong city, Quang Ngai city and 7 plain districts of Quang Ngai province.
- Generating power with installed capacity of 16 MW
- Mitigating downstream flooding and supplying water to aquaculture and breeding.
- Developing tourism, mitigating downstream saline intrusion, improving ecological environment for the project area.
Major technical parameters:
Catchment area: 460 km2
Work grade: II
Surcharged water level (SWL): +130.62m
Normal water level (NWL): +129.50m
Dead water level (DWL): +96.00 m
Total storage capacity: 289.50million m3
Effective storage capacity: 258.70million m3
Dead storage capacity: 30.80 million m3
Scale and structure ofproject major works:
- RCC gravity dam, dam crest elevation: +132,50m; dam crestwidth: +9m; total length: 333m, Hmax: 72.50 m.
- Surface, Ophiserov spillway with 6 segment gates, size ofgate: 6(14x11)m, max relief discharge p=0.1% = 8557 m3/s.
- Intake: sill elevation: 87m,F= 4m, design discharge Q=37.80m3/s.
- Powerhouse installed capacity: 16MW, firm capacity: 2.50MW.
- Auxiliarydam (3-zone earth dam): Dam crest elevation: 133m; Dam crest length: 9m; Damcrest length L = 181m; Hmax=37m.
Other content
South Thach Han Reservoir(19/03/2014)
Lower Ayun Reservoir(18/03/2014)
Upper Easoup Reservoir(14/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Long Song Reservoir(11/03/2014)
Ta Trach Reservoir(08/02/2014)
Tan My Reservoir(07/01/2014)
Truoi Reservoir(07/01/2014)
Yen Lap Reservoir(03/01/2014)
Pa Khoang Reservoir(03/01/2014)
Suoi Hai Reservoir(03/01/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013