Nuoc Trong Reservoir

10:47 SA @ Thứ Sáu - 17 tháng 1, 2014


Project location:NuocTrong river, Quang Ngai province,the project is under construction.

Construction time:Investigation and design time: 2005-2010

Commencement:09/12/2005

Project managers:Nguyen Tri Trinh, Dinh Sy Quat, Vo Van Lung

Project tasks:

- Irrigating52.600 ha of agricultural land

- Supplying water to domestic use, Dung Quat economic zone, Van Tuong city, Quang Ngai city and 7 plain districts of Quang Ngai province.

- Generating power with installed capacity of 16 MW

- Mitigating downstream flooding and supplying water to aquaculture and breeding.

- Developing tourism, mitigating downstream saline intrusion, improving ecological environment for the project area.


Major technical parameters:

Catchment area: 460 km2

Work grade: II

Surcharged water level (SWL): +130.62m

Normal water level (NWL): +129.50m

Dead water level (DWL): +96.00 m

Total storage capacity: 289.50million m3

Effective storage capacity: 258.70million m3

Dead storage capacity: 30.80 million m3

Scale and structure ofproject major works:

- RCC gravity dam, dam crest elevation: +132,50m; dam crestwidth: +9m; total length: 333m, Hmax: 72.50 m.

- Surface, Ophiserov spillway with 6 segment gates, size ofgate: 6(14x11)m, max relief discharge p=0.1% = 8557 m3/s.

- Intake: sill elevation: 87m,F= 4m, design discharge Q=37.80m3/s.

- Powerhouse installed capacity: 16MW, firm capacity: 2.50MW.

- Auxiliarydam (3-zone earth dam): Dam crest elevation: 133m; Dam crest length: 9m; Damcrest length L = 181m; Hmax=37m.