Yen Lap Reservoir

Project location: Mip river, Van Nho stream - Quang Ninh province
Construction time: 1979
Project manager: In technical economic argument + technical design stage: Dao Tung (Mr)
Project duties:
- Irrigating 10,064 ha
- Controlling flood
Major technical parameters:
Catchment area: 183 km2
Work grade: II
Surcharged water level (SWL p=0.5%): + 31.37 m
Normal water level (NWL): +29.50 m
Dead water level (DWL): +11.50 m
Total storage capacity: 127.5 million m3
Effective storage capacity: 118.120 million m3
Dead storage capacity: 9.380 million m3
Scale and structure of main works:
• Earth dam: L = 270m, Hmax = 40 m and auxiliary dams
• Face, gated spillway, n (bxh) = 3(8x6)m, relief discharge (p=0.5%): 830 m3/s, spillway crest elevation: +23.50
• Sluice consists of 02 pipes, D=1.75m, total length of sluice: 160m, dimension of inspection corridor: 6.5 x 6.5m.
• Canal system:
+ Length of irrigation canal: 560 km, of which:
+ Main canal: 25 km, Primary canal 1: 115 km, secondary, tertiary, quarternary canals: 152 km, etc. and 1590 related structures. Chanh river siphon is the first one constructed by submerged method.
Other content
South Thach Han Reservoir(19/03/2014)
Lower Ayun Reservoir(18/03/2014)
Upper Easoup Reservoir(14/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Long Song Reservoir(11/03/2014)
Ta Trach Reservoir(08/02/2014)
Cua Dat Reservoir(21/01/2014)
Dinh Binh Reservoir(21/01/2014)
Nuoc Trong Reservoir(17/01/2014)
Ngan Truoi Reservoir(17/01/2014)
Tan My Reservoir(07/01/2014)
Truoi Reservoir(07/01/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013