Dinh Binh Reservoir

![]() |
Project location:Con river- Binh Dinh province
Construction time:Investigation and design time: 1995-2001 - Commencement time: 2002
Project managers:Nguyen Huu Ngoc - Nguyen Xuan Uc
Project tasks:
- Mitigating flood for downstream of Con river
- Irrigating 27,660 ha in the south of Binh Dinh province
- Aquaculture
- Generating power
- Releasing discharge of 3 m3/s to Con river for environment protection
Major technical parameters:
Catchment area: 826 km2
Work grade: II
Surcharged water level (SWL): +93.27 m
Normal water level (NWL): +91.93m
Dead water level (DWL): +65.00m
Upstream water level (UWL): +65,00m
Total storage capacity: 226.21 million m3
Effective storage capacity: 209.93 million m3
Dead storage capacity: 16.28 million m3
Flood mitigation storage capacity: 227.48 x 106m3
Scale and structure of the project major works:
- Gravity RCC dam, dam crest elevation: +95,55m.
- Length of non-overflow dam: 388m (total dam length: 571m),Hmax: 54.55 m.
- Surface spillway with 6 segment gates, dimension: 6(14x11)m operated by hydraulic cylinder, relief discharge p=0.5%= 4637 m3/s. Bottom outlet: 6 gates, dimension 6x(6x5)m, maximum relief discharge p=0.5% =2700 m3/s.
- Pressure intake,F=2.80m, design discharge: 38.1m3/s.
- Powerhouse behind dam, installed capacity: 6600 kw
- Van Phong weir: total length L=502m consists of 2 parts.
+ Earth weir: L= 32 m, (Hmax)=17,5m(non-overflow part)
+ Concrete weir (overflow part):width: 470m, (Hmax): 18m, relief discharge 1%=7376 m3/s.
- Irrigation canal consists of 3 main canals:
+ Van Phong canal: L= 32.42 km, design discharge: 18m3/s, total length of primary canal is 6.2 km and 176 related structures.
+ Vinh Thanh canal: L= 18.84 km, design discharge: 1.71 m3/s, 7 primary canals with total length of 6.2 km.
+ Ha Thanh canal: L= 2.87 km, design discharge: 0.44 m3/s, 5 primary canals with total length of 4.44 km.
Other content
South Thach Han Reservoir(19/03/2014)
Lower Ayun Reservoir(18/03/2014)
Upper Easoup Reservoir(14/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Long Song Reservoir(11/03/2014)
Ta Trach Reservoir(08/02/2014)
Nuoc Trong Reservoir(17/01/2014)
Ngan Truoi Reservoir(17/01/2014)
Tan My Reservoir(07/01/2014)
Truoi Reservoir(07/01/2014)
Yen Lap Reservoir(03/01/2014)
Pa Khoang Reservoir(03/01/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013