04:59' CH 27/02/2014
1. Location: Na Hang district, Tuyen Quang province
2. Stage: Technical design stage 1 and 2
3. Consultant: Power Engineering Consultants Company No.1 (PECC1)
4. Project Owner: EVN
5. Project scale and tasks:
- Tasks:
+ Flood control with storage capacity of 1 billion m3;
+ Power generation: installed capacity of 342MW, annual average power output: 1,295x106 KWh.
- Scale:
+ CFRD. Maximum dam height: 124.5m; dam length: 99.5m;
+ Spillway: 4 gates (15 x 15.15 ) m ; 8 bottom outlets (4.5 x 6); Q = 0.02%: 12,736 m3/s
04:36' CH 24/02/2014
Ham Thuan - Da Mi hydropower project locates on La Nga river basin belonging to Dong Nai river basin. Ham Thuan hydropower reservoir is on Lam Dong and Binh Thuan provinces with reservoir surface area at normal water level (+605) of about 25.2 km2. Da Mi hydropower reservoir is a daily one, the lower step of Ham Thuan hydropower project. The two projects are away from each other about 10 km. Ham Thuan - Da Mi hydropower project is away from Ho Chi Minh city about 200 km.
01:53' CH 24/02/2014
1. Stage: Technical Design
2. Consultant: Power Engineering Consultants Company No.1 (PECC1)
3. Project Owner: EVN
4. Project scale: Installed capacity: 2400MW
5. Appraisal time: 2005
6. Appraisal results: Requirement satisfaction

Tài nguyên

© 2012 Vietnam Hydraulic Engineering Consultants Corporation - JSC.
Address: 95/2 Chua Boc Street, Dong Da District, Hanoi - Tel: (04) 3852-6285 - Fax: (04) 3563-2169
Chief Editor: Vo Van Lung - Deputy Director General

Visit Total: .
Visitor Online: .