Thac Ba Hydropower ProjectProject location: Chay river, Yen Bai province Project tasks: - Power generation - Flood control Construction time: - Commencement date: 19/08/1964 - River closure date: 22/02/1970 - Operation date of unit No.1: 05/10/1971 - Grid connection date: 19/05/1972 - Completion time: 12/1972 Two problems occurred during construction and after completion of the project are as follows: - Migration of great number of people - Rapid sedimentation speed in reservoir bed resulting to reduction of reservoir life Consultants: Bacu Hydro-energy Design Institute (former Russia) Corporation agency: Vietnam Hydropower, Hydraulic Design Institute (now HEC) Major technical parameters - Project grade: II - Catchment area: 6 140 km2 - Normal water level: +58.00 - Dead water level: +46.00 - Parapet crest elevation: +63.00 - Check frequency P%=0.01% at elevation: +62.00 - Total storage capacity: 2160 million m3 - Dead storage capacity: 780 million m3 Scale and structure of project works - Main dam: Rockfill dam, Hmax: 36m - Auxiliary dam: 16 dams (12 on right bank, 04 on left bank) - Spillway located on left bank, spillway width B: 68m, Q: 3 280 m3/s, gated spillway - Lock - Turnout: on left abutment of auxiliary dam No.3, dimension: 2x2m, length: 91m, design discharge Q: 10 m3/s. - Riverbed type hydropower plant with closed roof, 3 units, capacity of each unit: N=36MW. Turbine Õp-5a. Bb-450. Total capacity N=108MW. Annual average power output E: 411 million KWh. Annual capacity used hours: 3800h. Total hits 60 - Last update 04/03/2014 05:00' CH |
|