Dinh Binh Hydropower Project


03:19' CH-18, 18/02/2014

Project location: on the left side of Kon river, at spillway span No.8 in Vinh Hao commune, Vinh Thanh district, Binh Dinh province.

Project manager: Nguyen Xuan Uc

Project tasks:

- Generating power with capacity of 6600KW

- Controlling early, late floods

- Mitigating flood, supplying water for industrial and domestic uses

- Supplying irrigation water to agricultural production, rural industries and domestic uses

Major technical parameters:

Work grade: III

Technical parameters of the powerhouse:

+ Minimum discharge through 1 unit: Qmin=9.78 m3/s

+ Maximum discharge through 1 unit: Qmax=12.5 m3/s

+ Design head: Hdesign = 30.74m

+ Installed capacity: N = 6.6MW

+ Number of unit: 2 units

+ Turbine type: Francis turbine

+ Vertical axis 3-phase synchronous generator

+ Annual average power output: 32.22 million KW

Total hits 58  -  Last update 19/02/2014 02:36' CH

Tài nguyên

© 2012 Vietnam Hydraulic Engineering Consultants Corporation - JSC.
Address: 95/2 Chua Boc Street, Dong Da District, Hanoi - Tel: (04) 3852-6285 - Fax: (04) 3563-2169
Chief Editor: Vo Van Lung - Deputy Director General

Visit Total: .
Visitor Online: .
Sponsor links (Provided by VIEPortal.net - The web cloud services for enterprises)
Thiết kế web, Thiết kế website, Thiết kế website công ty, Dịch vụ thiết kế website, Dịch vụ thiết kế web tối ưu, Giải pháp portal cổng thông tin, Xây dựng website doanh nghiệp, Dịch vụ web bán hàng trực tuyến, Giải pháp thương mại điện tử, Phần mềm dịch vụ web, Phần mềm quản trị tác nghiệp nội bộ công ty,